RFP for Force Main Project

The Big Bear Area Regional Wastewater Agency invites and will receive sealed Bids up to but not later than 2:00 PM on Tuesday, February 18th, 2025 for the Force Main Project.  At said time, Bids will be publicly opened and read aloud at the Agency Office.  Bids received after said time shall be returned unopened. Bids shall be valid for a period of 90 calendar days after the Bid opening date.

The Force Main Project includes the following:

  • Segment 1: Remove and replace approximately 620 linear feet (LF) of 16-inch ductile iron pipe (DIP) with 16” DR-18 C-900 PVC pipe via open trench installation.
  • Segment 2: Remove and replace approximately 480 LF of 16-inch ductile iron pipe (DIP) with 16” DR-18 C-900 PVC pipe via open trench installation.
  • Remove and replace two 2-inch sewage combination air valve and vault assemblies.

The contractor is responsible for providing all labor, materials, and equipment needed to dewater, remove and replace, connect, pressure test, and re-commission the 1,100 LF of identified existing force main sections.

Force Main Project Specification_BID SET.pdfPlan Holder's List.pdf