Functions of the Wastewater Treatment Plant

We provide preliminary, primary, and secondary treatment to domestic and commercial wastewater for the Big Bear Valley. We provide physical, biological, and chemical treatment for wastewater to remove pollutants, disinfect, and produce effluent, which is suitable and safe for reintroduction back into the environment. The preliminary treatment is provided by a bar screen to remove large items from the waste stream and a grit removal system.

We treat an average inflow of 2.2 million gallons per day. The amount of wastewater handled by the treatment plant varies with the time of day and with the season of the year. 

Primary Treatment

During our primary treatment, sand, grit, and larger solids in the wastewater are separated from the liquids. Screens, settling tanks, and skimming devices are most commonly used for the separation. Primary treatment removes 45 to 50 percent of the pollutants.

Secondary Treatment

After primary treatment, wastewater still contains solid materials whether floating on the surface, dissolved in the water, or both. Under natural conditions these substances would provide food for organisms such as fungi, algae, and bacteria that live in a stream or lake. This second stage of treatment can remove more of the pollutants – up to 85 or 90 percent. Secondary treatment is largely a biological process. Air is supplied to stimulate the growth of bacteria and other organisms to consume most of the waste materials. The wastewater is then separated from the organisms and solids and disinfected to kill any remaining harmful bacteria.

The final effluent is used for irrigation of alfalfa fields in Lucerne Valley. 

Laboratory Functions

The laboratory is responsible for collecting and analyzing wastewater flows and biosolids to adhere to federal, state, and local guidelines and providing data to operations for implementing process control decisions. The laboratory is a key function in a wastewater treatment plant by:

  • ensuring daily compliance with the Agency’s National Pollutant Discharge Elimination System (NPDES) and discharge order permits by measuring pH, biochemical oxygen demand (BOD), total dissolved solids, suspended solids, nitrates, chloride, fluoride, sulfate, conductivity, and total and fecal coliform; 
  • conducting wastewater solids inventory and microscopic examinations of activated sludge for process control; and
  • preparation of treatment plant unit process evaluations and making recommendations for process control.
Sewer System Management Plan 

The California State Water Resources Control Board (State Water Board) adopted Statewide General Waste Discharge Requirements (WDRs) for sanitary sewer systems on May 2, 2006 as Water Quality Order No. 2006-0003-DWQ. In 2008, the Monitoring and Reporting Program (MRP) of the Statewide General WDRs was revised as Order No. 2008-0002-EXEC. The MRP was subsequently revised on September 9, 2013, as Order No. WQ 2013-0058-EXEC. Together, Order No. 2006-0003-DWQ and Order No. WQ 2013-0058-EXEC are referred to as the Sanitary Sewer System Waste Discharge Requirements (SSS WDRs) (Appendix I: Sanitary Sewer System Waste Discharge Requirements).

The goal of the SSS WDRs is to provide consistent statewide requirements for quantifying, reporting and reducing the number of wastewater spills and the volume of wastewater spilled in the state of California. The SSS WDRs require all public wastewater collection system agencies in California that own and operate sanitary sewer systems greater than one (1) mile in length, which collect and/or convey untreated or partially treated wastewater to a publicly owned treatment facility, to develop, implement, and maintain a Sewer System Management Plan (SSMP) and report sanitary sewer overflows (SSOs) using the State’s electronic reporting system, California Integrated Water Quality System (CIWQS).